Procedure For Installing A Foldable Container House
Shanghe shows customers the latest upgrade products, foldable container houses that can be installed quickly, and efficient new construction houses
1.Lift The Top
First the fasteners on the four edges of the foldable container home are removed, using hook latches to the four bottom corner sections between the eight corner assemblies. A controlled crane then lifts the hook, thereby lifting the top of the foldable container.
2.Place The Support Rod
Once the hook is secured in the elevated position and its location is confirmed, insert a support pole into the center of the container structure to bolster its stability and integrity, thereby safeguarding workers in the event the hook malfunctions and the upper section becomes uncontrollable and descends.
3.Shore Up The Back Wall
Lift the wall that has a window and push it outwards. Once the wall aligns perfectly with the back end of the foldable container house, secure it by placing screws and nuts on both the exterior and interior of the foldable container house, and then fasten them with a wrench.
4.Shore Up The Front Wall
Lift the other wall with doors and windows and push it outward, and repeat the previous step.
5.Immobilization
Make sure the hook is in good condition, move the container house to the final position and check its balance before removing the hook.
6.Complete The Installation
After installation, customers can add furniture according to their own use or use it directly